How the numbers work

Every capacity and financial metric in Supervisible starts from weekly planned hours, available hours, and per-person or per-project rates. This page lists every formula, a worked Harbor & Co. example, and where each number appears.

The short version

MetricFormulaWhere it appears
Available hoursWeekly override, else latest compensation Weekly hours, else profile default (40h), minus approved time offWorkload, Teams, Home
Utilization %round(assigned / available × 100) (0 if available is 0)Workload, Home
Capacity bandsUnder 70% Underutilized (<70%), 70-100% Healthy (70-100%), over 100% Overloaded (>100%)Workload, Teams, Home
RevenueSchedule row if present; else T&M sum(daily hours × bill rate), Retainer Monthly amount × days in window / days in month, Fixed remaining Project value spread over days, Non-billable $0Project page, Project Financials, Staffing, Home
Costsum(hours × cost rate) + expensesProject page, Project Financials, Staffing, Home
Margin %(revenue - cost) / revenue × 100Project page, Projects, Project Financials, Staffing, Home
Unsold capacityunused hours over next 4 weeks × trailing rateHome
Trailing raterevenue / billable hours for the same calendar monthHome (Revenue per hour), used for unsold capacity

Available hours

Available hours are the hours a person can work in a Sunday-start week before they go over capacity.

Formula: Supervisible checks, in order, a week-specific availability override, the latest compensation period Weekly hours effective on or before that week, the person's default availability (40h by default; valid range 0 to 168), or 0. Approved time off subtracts workingDays × (weekly / 5 - dayAvailability) across Mon-Fri working days.

Worked example: Owen Calloway has 40 Weekly hours (8h per weekday). In a week with 1 approved Full day off (0h available that day), his available hours are 40 - 1 × (8 - 0) = 32h.

Where it appears: Workload (Assigned / available), Teams, and Home. Note that public holidays with Marks everyone away on are deducted on Teams and Home → My week, but not on Workload or the workspace view of Home.

Capacity and utilization

Capacity percentage measures how much of a person's available hours are booked across all Active, Planned, and Draft projects (Completed and Cancelled projects are excluded).

Formula: round(assigned / available × 100), or 0 when available hours equal 0. In Percentage mode on Workload, a cell with 0 available hours shows a dash. Bars run up to 150%.

Capacity bands are fixed and cannot be configured:

  • Underutilized (<70%): under 70%.
  • Healthy (70-100%): 70% to 100%.
  • Overloaded (>100%): over 100% (shown in red).

Worked example (Owen Calloway on a 40h week):

  • 24h planned: round(24 / 40 × 100) = 60% (Underutilized (<70%)).
  • 32h planned: round(32 / 40 × 100) = 80% (Healthy (70-100%)).
  • 44h planned: round(44 / 40 × 100) = 110% (Overloaded (>100%)).

Where it appears: Workload cells (default view is Month, which splits Sunday-start weeks by Mon-Fri days; switch to Week for exact weekly cells). Range and group totals use a ratio of sums (sum(assigned) / sum(available)), while the Workload footer Average is the mean of per-person percentages.

Booked this week

Booked this week on Home (Owner and Admin only) is the ratio of total assigned hours to total available hours across active non-agent members for the current week.

Formula: round(sum(assigned) / sum(available) × 100).

Worked example (Harbor & Co. with 4 active people):

  • Nadia Okafor: 32h / 40h (80%)
  • Priya Lindqvist: 20h / 40h (50%)
  • Owen Calloway: 44h / 40h (110%)
  • Hana Moreau: 10h / 20h (50%)

Ratio of sums (Booked this week): (32 + 20 + 44 + 10) / (40 + 40 + 40 + 20) = 106 / 140 = 75.71%, which rounds to 76%. By contrast, the Workload footer Average takes the mean of per-person percentages: (80 + 50 + 110 + 50) / 4 = 72.5%, which rounds to 73%.

Where it appears: Home, on the workspace view.

Planned and actual hours

Planned hours always drive Workload, Teams, and Home capacity metrics.

Financial screens treat hours differently:

  • Project Financials, Staffing, and Home Money use logged actual hours when present, and fall back to planned hours when no actuals are logged (plus any unplanned logged hours).
  • The project page financial rows always use planned hours only.

Because Supervisible has no web UI to enter actual hours, actuals stay at zero unless your team logs them via POST /api/v1/actual-hours or the MCP tool upsert_actual_hours. When actuals are zero, financial totals use planned hours cleanly.

Revenue and the bill-rate chain

If a project has a monthly revenue schedule row, that schedule row always wins. Otherwise, revenue depends on Billing:

  • Retainer: Monthly amount × days in window / days in month. Example: a Copperleaf Studio retainer at $12,000 Monthly amount over a 7-day window in November (30 days) earns $12,000 × 7 / 30 = $2,800.
  • Fixed: remaining Project value spread evenly across project days. Example: Lumen Robotics Platform Redesign has $45,000 Project value overall and $1,957 in the week of Nov 17.
  • T&M: sum(daily hours × bill rate) using the bill-rate chain below.
  • Non-billable: $0. Excluded from Project Financials, and Revenue and Margin rows are hidden on the project page.

Bill-rate lookup chain (per working day)

Supervisible picks the first non-empty bill rate in this order. There is no org-wide default bill rate.

  1. Assignment Bill rate per hour (set in the Confirm assignment modal on Staffing).
  2. The person's latest Default bill rate (Settings → Members) or compensation period Bill rate effective on that date. Placeholders skip this step.
  3. The capability's Bill rate (Settings → Capabilities).
  4. T&M projects only: the project's Hourly rate.
  5. Otherwise $0.

Worked example: Owen Calloway logs 12h on a T&M project with a $120 project Hourly rate, a $130 Engineering capability Bill rate, and a $150 Default bill rate on Owen's profile (no assignment override). Step 2 wins, so revenue is 12 × $150 = $1,800.

Bill-rate chain for Owen Calloway (12h, T&M): 1 Assignment not set; 2 Person $150/hr wins (placeholders skip); 3 Capability (Engineering) $130/hr; 4 T&M project $120/hr; otherwise $0. Revenue: 12h × $150/hr = $1,800.
Supervisible checks each level in order. The first set rate wins, and later rates are never read.

Changing billing terms regenerates schedule rows from the current month onward only. To update past months, open Project Financials, open the project's row menu, and choose Rebuild schedule from billing terms.

Cost

Project cost is the sum of labor cost plus project expenses.

Formula: sum(hours × cost rate) + expenses.

  • Named people use their compensation/member Hourly rate (user_cost_settings.hourly_rate). There is no capability fallback for named people; if a person's cost rate is missing, the project is flagged as missing cost rates.
  • Unassigned capability placeholders use the capability's default cost rate.

Worked example: Owen Calloway ($65/hr cost) works 20h ($1,300) and Felix Ambrose ($55/hr cost) works 10h ($550) on a week with a $150 Figma license expense. Total cost is $1,300 + $550 + $150 = $2,000. On Platform Redesign (Lumen Robotics), 1,022h total $42,506 in cost.

Where it appears: project page Cost row, Project Financials, Staffing P&L (Cost), and the revenue chart on Home.

Margin

Margin measures the share of revenue left after cost and expenses.

Formula: (revenue - cost) / revenue × 100.

Color thresholds are fixed: above 30% has no color, above 15% is amber, and 15% or lower is red.

Worked example (Platform Redesign for Lumen Robotics):

  • Whole project: ($45,000 - $42,506) / $45,000 × 100 = $2,494 / $45,000 × 100 = 5.54%, which rounds to 6% (red).
  • Week of Nov 17: ($1,957 - $2,735) / $1,957 × 100 = -$778 / $1,957 × 100 = -39.75%, which rounds to -40% (red).
Revenue and cost bars showing (revenue − cost) ÷ revenue. Project total (1,022h): $45,000 revenue, $42,506 cost, 6% margin. Week of Nov 17: $1,957 revenue, $2,735 cost, −40% margin.
A positive project margin can hide a single week where cost is higher than revenue.

Missing rates and zero revenue behave differently by screen:

  • Project Financials and the project page weekly rows return null (incomplete) when any cost rate is missing or revenue is 0 or less.
  • Staffing ignores missing cost rates.
  • Projects list calculates (estimatedValue - actualCost) / estimatedValue with expenses excluded, or 0.
  • The project page header chip (Healthy / At Risk / Off Track) computes (estimatedValue - totalCost) / estimatedValue and does not check for missing rates.

Projects list vs project page

Projects counts every assigned week in full and excludes expenses (putting Platform Redesign at 1,045h, $43,195 cost, and 4% margin), while the project page spreads each week across 5 weekdays, counts only days between the project's start and end dates, and adds expenses dated in that window (1,022h, $42,506 cost, and 6% margin).

Project page for Lumen Robotics Platform Redesign showing 1,022h, $42,506 cost, $45,000 revenue, 6% margin, and -40% in the week of Nov 17.
Whole-project totals on the left and weekly Margin % across the timeline. Why Projects shows 4% instead

Unsold capacity

Unrealized revenue estimates how much revenue your agency's open capacity over the next 4 weeks could generate at this month's rate. On Home, hover Free in the next 4 weeks to see what those hours are worth at this month's rate.

Formula: unused hours over the next 4 weeks × trailing rate. If the trailing rate is null (no billable hours or revenue), Home shows the unused hours alone.

  • Unused hours come from Free in the next 4 weeks (weeks 2 to 5, excluding this week).
  • Trailing rate is revenue / billable hours for the current calendar month (not a multi-month rolling window). Home shows it as Revenue per hour.

Worked example (Harbor & Co. in November): if November has $48,000 revenue across 320 billable hours, the trailing rate is $48,000 / 320 = $150/hr. With 120 unused hours across weeks 2 to 5, the unsold capacity is 120 × $150 = $18,000.

Where it appears: Home, on the workspace view (Owners and Admins with financial visibility).

Revenue in November on Home showing $21.5K, $4,847 more than October, a chart of revenue against cost by month, Booked for December $40.5K, Margin 6%, Revenue per hour $35/h, and Financials.
Revenue per hour is the trailing rate that prices unused hours in weeks 2 to 5.

Rates

Supervisible stores four distinct rate fields across different screens:

RateWhat it doesWhere to find and edit it
Cost Hourly rate (or Monthly Cost)Calculates labor cost and project margin for a named personSettings → Members (toggle Hourly Rate / Monthly Cost in display panel) or person's Compensation tab
Default bill rate / Bill ratePerson-level or capability-level bill rate for T&M revenueSettings → Members inspector (Default bill rate), person's Compensation (Bill rate), or Settings → Capabilities (Bill rate)
Project Hourly rate / Bill rate per hourProject-level fallback for T&M revenue, or assignment overrideProject Billing section (Hourly rate) or Staffing assignment modal (Bill rate per hour)
Trailing rateSame-month revenue / billable hours used for unsold capacityCalculated automatically; shown on Home as Revenue per hour

Free hours and half days

Free hours are computed differently on Home versus Teams:

  • Home (Free this week, Free in the next 4 weeks): sum(max(0, available - assigned)). Overbooked people contribute 0 instead of a negative number (not netted). Using the 4-person Harbor & Co. example above (Nadia 8h free, Priya 20h free, Owen 4h over → 0h, Hana 10h free), Free this week is 8 + 20 + 0 + 10 = 38h.
  • Teams (Free / wk): available - booked, averaged over the selected horizon (8 weeks by default, or 12). Overbooked members do net against teammates, and a net-overbooked pod shows negative Free / wk in red.

Half day time off always sets that day's availability to 4 hours (workingDays × (weekly / 5 - 4) across Mon-Fri). On a 40h week (8h/day), one Half day removes 4h. On a 20h week (4h/day), one Half day removes 0h.

Why two screens differ

Staffing P&L (where Fernhill Goods Content Marketing shows -51% margin) and a project's detail page can legitimately show different revenue, cost, and margin numbers for the same project:

DimensionStaffing P&LProject page
Default date rangeCurrent monthWhole project window
Hours usedLogged actual hours if present, else planned hours, plus unplanned logged hoursPlanned hours only
Missing cost ratesIgnored (margin still calculates)Margin is null (Incomplete)
FallbackWhole-project estimated value and total cost with no expensesNone
Project statuses includedFull P&L for Active projects only (Draft and Cancelled excluded)Any open project page

Home also differs from Project Financials: Home excludes only Cancelled projects (while Project Financials excludes Draft, Cancelled, and Non-billable). The Financials link on Home opens Project Financials on the same month.

Staffing board showing Fernhill Goods Content Marketing at -51% margin for the current month alongside other active projects.
Staffing P&L defaults to the current month and ignores missing cost rates.