See capacity, revenue and margin

Use Home to see what needs a response, this month's revenue and margin, and how booked the team is. Each section links to its full view.

Who can do thisOwner or Admin. Money needs financial visibility.

Open the workspace view

Go to Home

Open Home. Owners and Admins land on the workspace view, titled with your workspace's name.

Switch views

Use the switch in the top right to move between the workspace view and My week.
Home workspace view showing the counts that need a response, this month's revenue with a chart, Booked this week with a chart, and the Pods table
The workspace view puts what needs a response first, then revenue, capacity, and pods.

Read what needs a response

The strip at the top counts what is waiting. Only counts above zero appear, and each one opens the page where you answer it:

  • Time off requests waiting open Time Off → Approvals.
  • Hours requests waiting open the project they belong to.
  • Projects past their end date open Projects on the Past end date view.
  • People over this week open Workload.
  • Roles with nobody on them open Staffing.
  • People without a cost rate open Settings → Profitability.

Read the capacity section

Booked this week is total assigned hours divided by total available hours. The chart under it shows booked hours against capacity for the weeks ahead. Three figures follow:

  • People over this week: people above 100% of their available hours. Hover it to see by how many hours.
  • Free this week: unused hours this week.
  • Free in the next 4 weeks: unused hours across weeks 2 to 5.

Select Workload on the section to open the full view.

Pods lists each team that runs projects, with its lead, people, people over capacity, projects, and how booked it is over the next 8 weeks. Select a pod to open Home for that pod.

At the bottom, Approvals waiting and Projects ending show the first few requests and ending projects, which you can answer in the row.

How utilization and bands work

Utilization is planned hours divided by available hours. Available hours equal a person's weekly availability minus approved time off and public holidays. Completed and cancelled projects do not count.

For example, 30 planned hours against 40 available hours is 75%. If approved time off cuts availability to 24 hours, the same 30 planned hours is 125%.

Utilization bands are the same everywhere in Supervisible. They are fixed and cannot be configured:

UtilizationStatusColor
Under 70%UnderutilizedAmber
70–100%HealthyNo color
Over 100%OverloadedRed
Two capacity bars for the same 30h planned. Against 40h available, 30 ÷ 40 is 75% (Healthy). With 16h time off leaving 24h available, 30 ÷ 24 is 125% (Overloaded).
Approved time off cuts available hours, raising utilization without adding planned work.

Read the revenue section

The revenue section is titled with the current month (for example, Revenue in November). It shows this month's revenue, how it compares with last month, and a chart of revenue against cost by month. Calculations use logged hours where they exist, and planned hours otherwise.

Three figures follow:

  • Booked for next month: revenue already scheduled for the month ahead.
  • Margin: the share of revenue left after cost.
  • Revenue per hour: this month's revenue divided by billable hours.

With financial visibility, hover Free in the next 4 weeks to see what those unused hours are worth at this month's rate.

How each number is calculated
  • Hours: logged hours where they exist, otherwise planned hours.
  • Revenue: per project per month, the project's scheduled monthly amount if it has one. Otherwise, for time and materials, hours × bill rate. Bill rate uses the assignment rate first, then the person's default billable rate, then the capability default, then the project's hourly rate.
  • Cost: hours × the person's hourly cost rate.
  • Margin: (revenue − cost) ÷ revenue. Shows "Unknown" when cost rates are missing.
  • Revenue per hour: this month's revenue ÷ billable hours.
  • Unsold capacity: unused hours over the next 4 weeks × Revenue per hour.
Unknown margin

If people lack cost rates, Margin shows "Unknown" and the strip at the top counts the people without a cost rate. Select that count to open Settings → Profitability and add the missing rates.

See margin on one project

On a project page, below the people timeline, four rows show weekly Hours, Cost, Revenue, and Margin, with project totals on the left. These rows appear only if you have financial visibility.

Weekly margin uses the same formula as Home: (revenue − cost) ÷ revenue. A red value means cost was higher than revenue that week.

For example, the Platform Redesign project for Lumen Robotics totals 1,022h, $42,506 cost, $45,000 revenue, and 6% margin. In the week of Nov 17, it billed $1,957 against $2,735 of cost, for a -40% margin. Later weeks sit near 0%.

Revenue and cost bars showing (revenue − cost) ÷ revenue. Project total (1,022h): $45,000 revenue, $42,506 cost, 6% margin. Week of Nov 17: $1,957 revenue, $2,735 cost, −40% margin.
A positive project margin can hide a single week where cost is higher than revenue.

Expenses added on the project, such as a Figma license, are listed under Expenses.

Project page for Platform Redesign showing weekly Hours, Cost, Revenue, and Margin rows, totals on the left, and Expenses below
Weekly Hours, Cost, Revenue, and Margin rows on a project page.

Who sees money

Financial visibility is set under Settings → Profitability → Visibility Settings. Owners and Admins see the revenue section by default. A project's account manager also sees that project's financials. All other roles see only the capacity sections.